Industry Leading Gold Projects

TPK, Ontario

The TPK Project hosts two large mineralized systems within claims spanning 76,292 hectares located on the regional winter-road network which connects directly to the Musselwhite Gold Mine access road north of Pickle Lake, Ontario.

Gold Ridge–Discovery Zone high grade gold & copper:

  • GR-25-011: 19.39 g/t Au over 8.2 m

  • GR-25-012: 3.06% Cu, 60.3 g/t Ag & 1.5 g/t Au over 1.5 m (incl. 11.1% Cu, 218 g/t Ag & 4.45 g/t Au over 0.40 m).

Big Dam - Goose Lake Zone:

  • TPK-10-004: 25.90 g/t Au over 13.5 m (incl. 46.0 g/t Au over 0.5m, 139.4 g/t Au over 1.7 m).

TPK Discovery Continues

01

Phase 1 Complete

93 grab samples, 173 soil and humus samples, 17.8 line-km ground EM, 15 line-km gravity.

02

Targets Defined

Three new drill targets ranked from mapping, sampling and geophysics

03

Permits In Place

Fall program permitted

04

Fall 2026 Drilling

Gold Ridge:  Discovery plunge, first-ever Sidewinder test, Big Dam: Goose Lake

Gold Ridge

19.39 g/t Au / 8.20 m

GR-25-011 core — Discovery Zone

incl. 359 g/t Au over 0.30 m

10.69 g/t Au

Outcrop grab — Sidewinder Zone

incl. 359 g/t Au over 0.30 m

11.1% Cu

GR-25-012 core — Discovery West

with 218 g/t Ag, 4.45 g/t Au / 0.40 m

144.68 g/t Au

Boulder grab — Gold Ridge

second boulder 28.48 g/t Au

Other Prospects

2026 Results

Rowlandson Lake

17.96 g/t Au, 865 ppm Cu; 2.64–17.96 over 3 samples

Copper Point

2.13% Cu; 0.50–2.13% Cu across 5 outcrop samples

Goose Lake

25.87 g/t Au over 13.50 m in historical hole TPK-10-004

Sidewinder population 

10 outcrop samples, 5 above 3 g/t Au

Why These Targets

Discovery Zone

near-surface high grade; southwest plunge; open at depth

Discovery West 

new EM target 250 m west

Sidewinder

70 m shear, 0.5 m wide, open south and never drill tested

Goose Lake 

southeast plunge never tested; oriented core planned

2025 TPK Gold Ridge Drill Program:​

​Visible Gold in Interval 11.8-12.1 m, hole GR-25-011 assayed at 308 g/t gold.