The TPK Project hosts two large mineralized systems within claims spanning 76,292 hectares located on the regional winter-road network which connects directly to the Musselwhite Gold Mine access road north of Pickle Lake, Ontario.
Gold Ridge–Discovery Zone high grade gold & copper:
GR-25-011:19.39 g/t Au over 8.2 m
GR-25-012:3.06% Cu, 60.3 g/t Ag & 1.5 g/t Au over 1.5 m (incl. 11.1% Cu, 218 g/t Ag & 4.45 g/t Au over 0.40 m).
Big Dam - Goose Lake Zone:
TPK-10-004:25.90 g/t Au over 13.5 m (incl. 46.0 g/t Au over 0.5m, 139.4 g/t Au over 1.7 m).